Scottsdale permit fees and timelines, and how to read them

By So So Deep Contractor Search · Published August 18, 2026 · Updated August 18, 2026 · How the ranking works

Bottom line

Scottsdale does not publish one fee for "a permit." Use the city's own calculator and the published plan-review table. We do not compute fees. A contractor who will not say who pays the city is not done quoting.

A blog that quotes a single "Scottsdale permit fee" is guessing. The city charges by permit type and by the measurements on the application.

Where the city publishes the number

The live calculator is eservices.scottsdaleaz.gov/bldgresources/PermitFee. You pick a permit type and enter footage. Development fees are added for new construction. For native plant, swimming pool, signs, and special event permits the calculator says to call the One Stop Shop at 480-312-2500.

We retrieved that page on 2026-08-18. We are not going to paste a dollar figure that will be wrong next week.

Published review windows

From Plan Review Services, retrieved the same day:

Plan typeAdministrative reviewSubstantive review
Small Scope Review, flood-zone X/D1 day5 days
Pools, fences, walls, signs5 days5 days
Tenant improvements7 days10 days
All other plan types7 days15 days
XLT (commercial / multifamily 50,000 SF+ / 4 stories)7 days20 days

That is the city's table, not our estimate of when the inspection happens.

Once a permit is issued

Permit Services says you have 180 days to obtain the first inspection or the permit expires. Each following inspection must occur within 180 days of the last one. Work without a required permit is fined double the permit fee.

How to use this when you hire

Ask the contractor which permit type they will file, who pays the city, and whether the quote includes those fees. Then look the firm up on the ROC search and, if you want a shortlist, on the Scottsdale rankings.

A permit fee is not a contractor ranking. A fast review window is not a workmanship guarantee. Both are city process, and the city is the authority.

Get a shortlist matched to your address

First one free

This page ranks the whole state. Enter your address and we'll narrow it to contractors who have pulled permits near you, check every license for standing and disciplinary history, and hand back a ranked shortlist you can call.

No card needed. See a finished report first if you'd rather.

How to check this yourself

Frequently asked questions

How much is a building permit in Scottsdale?
It depends on the permit type and the measurements the city asks for. Use the official fee calculator, and call the One Stop Shop at 480-312-2500 for pool, native plant, sign, and special-event fees. Retrieved 2026-08-18.
How long does Scottsdale plan review take?
The city's Plan Review Services page publishes windows by plan type: 5 plus 5 days for pools, fences, walls, and signs; 7 plus 10 for tenant improvements; 7 plus 15 for other plan types. That is review time, not total project time.
Does So So Deep sell or file Scottsdale permits?
No. We rank licensed contractors on public records. The city issues the permit through SPUR.

Rankings and license facts reflect public records, not the quality of any individual job. This is not a workmanship guarantee. Always verify a contractor on the issuing board's official lookup before you hire.